ADMIRAL CONSTRUCTION CORPORATION BOSTON MASSACHUSETTS
General Contractors  ·  Construction Managers
home   |  our company  |  our work  |  client list  |  in the news  |  contact us
 






 

medical  |  corporate  |  corporate/retail  |  banking  |  historic  |  retail  | 
education  |  facilities  |  research  |  residential complexes

(research)                                                                                                                                                                                                                                    


1 · 2 · 3

  Project Highlights - Weitz Laboratory
  • Met highest levels of technology
  • Supplied and installed laboratory work stations
  • Supplied and installed fume hoods
  • High tech non-static floor and countertops

Project Highlights - Acid Waste Treatment

  • Addressed Harvard's environmental concerns
  • Furnished and installed state of the art acid waste water separation equipment
  • Retrofit all necessary piping for entire building to accommodate this system
  • Upgraded all building operating systems
Harvard University
Our expertise has enabled us to upgrade several laboratories to meet the highest levels of technology as shown above in the Weitz Lab.

Project Location
Oxford Street
Cambridge, MA

Architect
Douglas Okun and Associates
 



 

 
   © Copyright 2006 Admiral Construction Corp.  |  Website designed and managed by:
mpresion